Progress Team Install


Progress Onsite - PT. XSTI

Memuat, harap tunggu...

PROGRESS DAN DOKUMENTASI ONSITE

PT. XSTI - System Integration Technology

Progress Pekerjaan Harian

1. MOS dan EHS
2. Scan Material
3. Foto Before Part Atas Part Bawah MyTeleco
4. PreKitting
5. PreCO/Install

Tugas Part Bawah:

5.1.1 Install Cabinet baru
5.1.2 BBU
5.1.3 DCPD10
5.1.4 GPS Tray
5.1.5 LPU
5.1.6 SCU
5.1.7 Baterei (new/reuse)
5.1.8 PowerOn
5.1.9 Debug
5.1.10 Request Open Port to ETH

Tugas Part Atas:

5.2.1 Mounting Sec1/2/3 (new/reuse)
5.2.2 Antena sec1/2/3/4 (New/Reuse)
5.2.3 AAU Sec1/2/3/4
5.2.4 RRU Sec 1/2/3/4
5.2.5 Kabel Power Sec 1/2/3/4
5.2.6 Kabel Optic
5.2.7 Install GPS
5.2.8 Grounding Kit dan Clamp
5.2.9 Kirim Video Installasi Part Bawah
5.2.10 Kirim Video Installasi Part Atas
6. CO/MOCN

Sub Tugas CO/MOCN:

6.1 Sector 1 Up
6.2 Sector 2 Up
6.3 Sector 3 Up
6.4 Sector 4 Up
7. Test eNode After NOCN (sisi BSS) iTRAN Login local

Sub Tugas eNodeB After Mocn (sisi BSS) dan iTRAN Login local:

7.1 PingTest
7.2 Big Cross Test
7.3 All eNodeB Alarm cleared -> Alarm
7.4 RED Remotely RET Configuration
7.5 VSWR Test Alarm max. 1.3 -> VSWR Test
7.6 RSSI Imbalance Test max. -120 dBm -> RSSI-HP
7.7 700M Cell ActivationP
7.8 Upload Foto/ Capture eNodeB MyTeleco
8. BFT After Mocn Upload MyTeleco
9. Test Power CSU Ractifier SCU dan Baterei

Sub Tugas Power CSU Ractifier SCU

9.1 Capture NMS
9.3 Capture BMS
9.4 Pengukuran Bateray 0 - 30menit all Bank
9.5 Upload Foto/Gambar/ Capture MyTeleco
10. Test ENVA

Sub Tugas Environment Alarm Test

10.1 Door Opem Alarm
10.2 Main Failure
10.3 Rectifier Modul Fault
10.4 DC Under Voltage
10.5 AC/DC Surge Protector Failure
10.6 Baterey Stolen
10.7 Baterey Fault
10.8 High Temperature
10.9 Genset Running (jika ada genset)
10.10 Genset Failur/ Low Fuel (jika ada genset)
10.11 Upload Foto/ Gambar/ Capture MyTeleco
11. Pengukuran KWH
12. Dismantle dan Gbr Sket Layout AsBuilt

Dismantle

12.1 Foto RRU dan SN all sector dibawah
12.2 Foto Antena all sector dibawah (jika didismantel)
12.3 Foto Kabel Power all sector dibawah
12.4 Foto Kabel Optic all sector dibawah
12.5 Foto GPS dibawah
12.6 Foto Kabel GPS dibawah
12.7 Foto BBU dibawah
12.8 Foto All Part BBU dan SN dibawah
12.9 Foto all SFP dibawah
12.10 Foto Braket all Asesoris dibawah
12.11 Gambar Manual SiteLayout, Antena RRU AAU Placemant AsBuilt
13. Audit Antena AOR

Subtugas AOR (HI) After Mocn

13.1 Panoramic 0 s/d 360 derajat
13.2 Foto Full Antena All Sector
13.3 Foto Azimuth Antena All Sector
13.4 Foto RRU All Sector
13.5 Foto AAU All Sector
13.6 Foto Panoramic diatas antena All Sector
13.7 Mecanical Till All Sector
13.8 Electrical Till All Sector
13.9 Brecket Till All Sector
13.10 Type Antena terlihat Label All Sector
13.11 Tinggi Antena All Sector
13.12 Foto Bottom Antena (terlihat jumper) All Sector
13.13 Submit AOR iEPMS
14. Perapihan, Racktifikasi Labeling
15. Take Data ATP Dismantle LDM Sign
16. Take Data ATP Ran
17. BA Kunci MS dan Clear Site

Progress Keseluruhan

0% Selesai