CSU - SCU Rectifier Test


CSU - SCU Rectifier Test

CSU - SCU Rectifier Test (all Brand)

Form Data Informasi Site

Foto dan Capture Test yang diambil :

1 Rectifier Existing or Re-Use
2.3.1.2 2 Rectifier Brand and Type
2.3.1.3 3 Rectifier Module Quantity
2.3.1.4 4 Rectifier Load
2.3.1.5 5 ACPDB Condition (cable, mcb, arrester, grounding connections)
2.3.1.6 6 COS Box condition open and close
7 Number of Genset installed
2.3.1.8 8 Grounding to Neutral Voltage less than 5 V
2.3.1.9 9 Seal and condition of KWH Meter
2.3.1.10 10 Rectifier installed properly as Design Pack, BOQ and Site Model
2.3.1.11 11 ZTE SCU or Huawei Neteco for NMS Power Monitoring installed properly as site model
2.3.1.12 12 NMS Power Monitoring is properly connected and can be monitored (all alarm visible)
2.3.1.13 13 All Rectifier Alarm cleared
14 Rectifier Parameter Setting as standard from planing
2.3.1.14.1 Fload Voltage
2.3.1.14.2 Equal Voltage
2.3.1.14.3 Out. High Off
2.3.1.14.4 DC Under Voltage
2.3.1.14.5 Batery Low Voltage
2.3.1.14.6 Charge Currant Limit
2.3.1.14.7 Automatic Equal Charge
2.3.1.14.8 End Voltage Test
2.3.1.14.9 LLVD 1 Value
2.3.1.14.10 BLVD 1 Value
2.3.1.14.11 Battery Temp COmpensation
15 LLVD1 and LLVD2 (BLVD) Connection as standard from planning
2.3.1.15.1 LLVD1 Connection to RRU as table below
2.3.1.15.2 LLVD2 (BLVD) Connection to BBU, MW, IPRAN, HTISCC800, ZTE SCU, Colling System as table below
Maksimal 10 foto. Format JPG/PNG.

Hasil Submit

Petunjuk untuk File Excel:

1. File Excel berisi data teks dan gambar yang dapat diedit

2. Gambar disisipkan sebagai objek yang dapat diubah ukurannya

3. Setiap gambar memiliki keterangan di bawahnya

4. File Excel dapat diedit langsung di Microsoft Excel